 |
|
Download Sheds Manuals and Shed Erecting Videos |
Do It Yourself - Manuals
Shed Manual
Before logging in to the shed manuals, you need to read the following Very Important Tips which will help you erect a sensational new shed.
- As soon as your materials are delivered, check you have all of your materials as
per the bill of materials supplied by ShedCo.
- Download erect manual an read thoroughly several times.
- Ensure you have all the tools you require before you start erecting.
- Make sure you have a mate to give you a hand and they also read instructions.
- Make sure you have your hold down bolt set out from ShedCo.
Tools Required
- Extension and step ladder
- Extension leads
- Reversible drill
- Spirit level
- Tape Measure (big enough for your job)
- Hammer Drill
- Drill bits for concrete (eg. 12mm or 16mm depending on hold down bolts)
- Good rope and star pickets to help brace frame
- Tin snips (left and right handed)
- Nibbler or shears to cut openings
- Spanners and general hand tools
- Wood saw
- One
piece 4" x 2" timber at about 300mm long (for damming sheets)
- Teck screw adapters and drill bits to suit hardware
- Pop rivet gun
- Silicon and silicon gun
- Set square
- Builders pencil
Please log in using the Customer Login Panel on the left side under the ShedCo logo to download the Shed Manuals. |
Do It Yourself - Slabs
Materials
- Concrete.
- Mesh whatever recommended (eg. F62)
- Plastic for under slab.
- Mesh stools to hold mesh at correct height.
- Water available on site.
Tools
- Formwork - Can be purchased from ShedCo.
- Trowel's for finishing and edging.
- Helicopter - Hire from local hire agent.
- Bull float - Hire from local hire agent.
- Mud Barrow- Hire from local hire agent.
- Sting lines to set out slab.
- Steel pegs to hold up sting lines and form boards.
- Levelling pegs for setting height of concrete in middle of slab.
- Shovels to help spread concrete.
- Screeding board to held float of concrete.
- Compactor - Hire from local hire agent.
Set-up
- Level to help get site correct (dumpy or laser - from local hire)
- Compact if site is new fill or loose soil.
- Set out string lines to slab size(check diagonal to make sure they are the same)
- Mark out and dig footing holes.
- Set up form work making sure it is straight, level and its internal size is as per
your plan.
|
Shed Erecting Videos

Please log in using the Customer Login Panel on the left side under the ShedCo logo to have access to the videos. |
|
|
|